Confirm the hard-cost assumption
$331,574Largest absolute effect on profit or cash required, within this entered comparison.
Profit -$331,574 · cash required +$120,974YOUR PROJECT / THE DECISION DESK
Connect the cash, the choices and the evidence. Compare the plan you entered with a combined stress case, then inspect the changes you would actually consider.
The starting project is a teaching case until you enter your own facts. The stress case is an assumption, not a prediction. Retail reference prices and quote comparisons do not silently replace your installed project budget.
01 / BASE CASE
Project cash required, including the reserve
02 / ENTERED STRESS CASE
Project cash required, including the reserve
Review the cash gap and margin, then adjust the changes you are willing to make. Adding cash can fund a plan; it does not improve its profit.
SHARED WITH YOUR WORKBENCH
YOUR SCENARIOS
ONLY THE CHANGES YOU ENABLED
Each alternative is tested against the same base and combined-stress assumptions. These are finite comparisons; they do not establish the best possible design or all possible risks.
| Entered alternative | Base / stress targets | Cash required / gap | Margin / profit | Final closing |
|---|---|---|---|---|
| Phase starts | Base needs changeStress needs change | $1,822,654$822,654 funding gap | 7.7%$403,996 | May 2028 |
WHICH ASSUMPTION MOVES THE RESULT?
Largest absolute effect on profit or cash required, within this entered comparison.
Profit -$331,574 · cash required +$120,974Largest absolute effect on profit or cash required, within this entered comparison.
Profit -$73,646 · cash required +$73,646Largest absolute effect on profit or cash required, within this entered comparison.
Profit $0 · cash required $0Each sensitivity is tested separately. Effects do not add up to the combined stress and are not probabilities or expected losses. Site costs compare the lower and upper additional allowances.
YOUR DOCUMENTS / YOUR NEXT ACTION
0 of 4 topics marked confirmed by you. Store references and notes; documents are not uploaded. The linked public guidance is a Raleigh pilot and does not verify your property.
Keep the written service confirmation, connection point, required upgrades and cost responsibility together.
Raleigh water and sewer processRecord the survey, access evidence and qualified site assessment that support the site budget.
Confirm quantities, installation, freight, exclusions, validity dates and which packages remain allowances.
Record the exact outstanding correction, responsible person and dated response. A review target is not a promised permit date.
Raleigh review targets and processFROM YOUR SAVED QUOTES
Compare dated quotes to separate quantities, prices, scope and fees. An illustrative example is available in the quote tool.
Explain a quote changeA BRIEF YOU CAN REVISIT
Save the current base and stress results. The next visit can show what changed. Up to 12 snapshots stay in this browser.
Recorded evidence status does not change costs automatically. The quote tool and cost book retain their own scope and dates. Public research has no access to your project inputs.
Your project inputs stay in this browser unless you explicitly export or share them. Public source requests do not include your budgets.