Land readiness passport

Keep the approvals, conditions and unanswered questions behind a land decision in one working record. Connect an unresolved delay to your project economics.

Edits will save in this browser. Project details stay on this device until you choose to share an export. Official links provide regional guidance; StackX has not checked or approved this parcel.

01 / LOCAL WORKSPACE

Identify the project

Guidance for the City of Raleigh. Confirm city limits, planning jurisdiction, utility provider and county for the actual parcel.

Import replaces the current passport. It does not change the shared feasibility project.

Unresolved evidence areas6Includes missing evidence, conditions, date issues and review flags
Dated evidence0 / 6A recorded date is not independent verification
Review or expiry flags0Check dates, elapsed review window or recorded expiry
Longest open estimate—Your estimates; overlap is not inferred

02 / ACTION ORDER

Next evidence to obtain

This order reflects missing evidence, conditions and review dates. It does not score approval probability or establish a construction start date.

  1. Jurisdiction, zoning and product — Obtain evidence. Add a concrete next action. Assign an owner.
  2. Water service and capacity — Obtain evidence. Add a concrete next action. Assign an owner.
  3. Wastewater or septic — Obtain evidence. Add a concrete next action. Assign an owner.

Raleigh separates intake, review rounds, applicant resubmissions and final review. Published review benchmarks are goals, not a promised permit date. Raleigh review turnaround dashboards

03 / SIX REVIEW AREAS

Evidence ledger

“Recorded approved” is your assessment. Record the document, date, scope and outstanding conditions. A website link alone does not establish parcel approval.

Jurisdiction, zoning and productUnverified · Obtain evidence

Confirm the authority, permitted use, density, setbacks and any parcel-specific conditions.

Obtain evidence

No evidence or review date recorded.

Water service and capacityUnverified · Obtain evidence

Identify the provider, connection scope, availability evidence and any off-site work.

Obtain evidence

No evidence or review date recorded.

Wastewater or septicUnverified · Obtain evidence

Record the actual capacity approval or septic evidence, conditions and expiration.

A parcel using private well or septic services follows a different approval path. The residential permit guide identifies prerequisites; record the applicable approval yourself.

Obtain evidence

No evidence or review date recorded.

Access, survey and easementsUnverified · Obtain evidence

Confirm legal access, recorded boundaries, easements and road or driveway approvals.

Obtain evidence

No evidence or review date recorded.

Floodplain, drainage and gradingUnverified · Obtain evidence

Check floodplain, buffers, stormwater, erosion-control and grading requirements with the responsible authority.

Obtain evidence

No evidence or review date recorded.

Plan review and building permitUnverified · Obtain evidence

Distinguish application intake, review comments, approval and an issued permit. Record the actual stage.

Review time is only part of elapsed project time. Track incomplete intake and applicant resubmissions separately in your schedule.

Obtain evidence

No evidence or review date recorded.

04 / CONNECT TO FEASIBILITY

What would a delay cost?

Choose the combined schedule delay yourself. Reviews may overlap; adding every estimate would overstate the project delay.

Open feasibility model

Save a project in the feasibility model to connect its financing and carrying costs. The passport remains usable on its own.

Official source guides reviewed 2026-09-06 UTC. They are starting points for the named jurisdictions, not a complete entitlement opinion or proof of service availability.

Untitled land passport

No site reference recorded · Raleigh, North Carolina

Printed 2026-10-08 UTC. User-maintained evidence; no parcel approval independently verified by StackX. Review window: 90 days.

Jurisdiction, zoning and product — Unverified

Evidence not recorded.

Evidence date: Not recorded · Reviewed: Not recorded · Expiration: Not recorded

Source: No valid evidence link recorded

Owner: Unassigned · Estimated delay: Unknown

Next action: Not recorded

Water service and capacity — Unverified

Evidence not recorded.

Evidence date: Not recorded · Reviewed: Not recorded · Expiration: Not recorded

Source: No valid evidence link recorded

Owner: Unassigned · Estimated delay: Unknown

Next action: Not recorded

Wastewater or septic — Unverified

Evidence not recorded.

Evidence date: Not recorded · Reviewed: Not recorded · Expiration: Not recorded

Source: No valid evidence link recorded

Owner: Unassigned · Estimated delay: Unknown

Next action: Not recorded

Access, survey and easements — Unverified

Evidence not recorded.

Evidence date: Not recorded · Reviewed: Not recorded · Expiration: Not recorded

Source: No valid evidence link recorded

Owner: Unassigned · Estimated delay: Unknown

Next action: Not recorded

Floodplain, drainage and grading — Unverified

Evidence not recorded.

Evidence date: Not recorded · Reviewed: Not recorded · Expiration: Not recorded

Source: No valid evidence link recorded

Owner: Unassigned · Estimated delay: Unknown

Next action: Not recorded

Plan review and building permit — Unverified

Evidence not recorded.

Evidence date: Not recorded · Reviewed: Not recorded · Expiration: Not recorded

Source: No valid evidence link recorded

Owner: Unassigned · Estimated delay: Unknown

Next action: Not recorded

Delay sensitivity

Combined scenario: 3 extra months. Individual review delays are not summed.

No valid linked feasibility calculation.

Constant sales, costs, debt and average draw assumptions; excludes extension fees, penalties, repricing and additional site work.

Your project inputs stay in this browser unless you explicitly export or share them. Public source requests do not include your budgets.